← Latest stories

AM Solutions launches D3 depowdering system for EOS P 770 builds

AM Solutions has launched the enclosed D3 system for unpacking and reclaiming powder from EOS P 770 builds weighing up to 90 kg. The company quotes about 20 minutes for PA12 and recovery of up to 95%.

AM Solutions D3 system configured for an EOS P 770 build frame
Image: AM Solutions / TCT Magazine

AM Solutions has introduced the D3 automated unpacking and depowdering system for EOS P 770 build jobs. The enclosed, three-station machine accepts build frames weighing up to 90 kg and uses an electric actuator to move the parts and powder into a vibrating process chamber.

For PA12, AM Solutions quotes an unpacking time of about 20 minutes depending on build height and packing density. Powder passes through a screen into Polyboxes. The unpacking stage uses no compressed air, and parts are returned to the frame rather than dropped. The system can also separate less heat-affected peripheral powder from powder close to the parts.

An optional Unpacking Plus cycle is claimed to recover up to 95% of powder, although the figure depends on packing and geometry and is a manufacturer specification. FKM Additive has beta-tested the system, which is scheduled for display at Formnext.

Key facts

  • Target platform: EOS P 770
  • Maximum build-job weight: 90 kg
  • PA12 unpacking: about 20 minutes (condition-dependent)
  • Unpacking Plus recovery: up to 95% (company claim)
  • Compressed air during unpacking: not used

Context

The D3 offers an enclosed, automated route to reduce manual handling and operator exposure during large SLS build unpacking and powder management.

Suggest a correction

AM Solutions launches D3 post-processing system for EOS P 770 additive manufacturing platform

Visit source
Find a story

Find the brands and technologies you follow.