FASTECH Secures Bolton Site for UK Metal AM Production
US manufacturer FASTECH has secured a facility in Bolton, Greater Manchester, and plans to begin production with a Meltio robotic laser-wire DED cell in the first quarter of 2027.

US metal-parts manufacturer FASTECH has formed a UK entity and signed for premises in the Bolton area of Greater Manchester. In independent reporting by 3D Printing Industry, the company said it plans to establish its first British production capability with a Meltio robotic laser-wire DED cell in the first quarter of 2027.
The initial operation will be smaller than FASTECH's Danville, Virginia, base, with WAAM and subtractive equipment potentially added as demand develops. In the United States, FASTECH combines Gefertec, AML3D and Meltio systems with CNC machining, heat treatment and inspection, and says it produces repeat Inconel ring orders for Siemens Energy.
The opening timetable, later equipment additions and customer demand remain plans rather than completed outcomes. The announcement does not show that the UK site has yet matched the throughput or quality of FASTECH's US operation; technology transfer, local hiring and part qualification still lie ahead.
Key facts
- UK entity formed and premises secured in the Bolton area
- Meltio robotic laser-wire DED cell planned for Q1 2027
- WAAM and subtractive equipment may follow if demand develops
- US operation produces repeat Inconel ring orders for Siemens Energy
Context
The move is notable as an attempt to transfer a repeat-production model integrating wire DED and finishing to the UK, rather than opening a demonstration lab.


